This website is © Garry Glazebrook, 2018. Ver 1.16 Last updated 2 May 2018 . Designed by NogginSoft.com
Click here for a summary of what is newly published.
This website was last updated on 2 May 2018.
By all means email me at g.glazebrook@bigpond.com for comments or feedback
If you are really feeling like a good read, here are some of my articles:
I have added a detailed Operations Manual for those wanting to take part in the
now regular operating sessions that are held every 6 weeks or so. The Manual will
be periodically updated. A link to the manual has also been placed on the Articles
tab, as well as in the blurb on the New Layout tab.
Modelling the Newcastle Steelworks
Planning the Second Newcastle-Fassifern Railway
Planning the (First) Newcastle-Fassifern Raliway
Selectively Compressed Timetables
Looking Forward to Some New Mistakes
Operating the Newcastle - Fassifern Railway (or Modelling the Railways of NSW
2017) - part 1 and part 2. They are each around 9MB so may take a little while to
download, depending on your internet connection speed.
Regards
Garry Glazebrook